There will be a lot to consider for your salt wall project; however, having everything clearly documented within your product submittal will ensure all parties have the information they need.
Everything an owner and design team need to know will need to be communicated to the construction site (Construction Specifications Institute). Having everything related to your salt wall within your submittal means you can include the product details, sample, quantities and delivery requirements.
1. Product details
Ensure you have specified whether it is salt tiles or salt bricks. Include the size, thickness, finish and profile of the edges. If there is a tolerance on the size you would like to have, include this in writing.
For example, HSW have a salt tile product which is 8" × 4" × 1". Include the current specifications from the supplier. This way, the purchasing and install teams have everything they need.
2. Sample approval
Salt products can come in a variety of colours and patterns. Include a sample or sample board so the design team can see how it looks in similar lighting to the final space.
Include a note on why the sample is being approved. This could be for colour variation, finish, edge detail and overall look. The sample can give an indication of what the finished product will look like, however there could be some natural variation in the full supply.
3. Quantity & Weight
Include the dimensions of the wall, proposed tile layout, estimated quantity and weight per piece as specified by the supplier. The actual weight of the delivery could include the weight of the cartons.
The project team should ensure the total weight of the finished wall including the structure to support it has been confirmed with the correct installer or building professional. You can view our salt wall pricing guide for more information on how tile quantities and wall areas can affect your project.
4. Installation details
Within your submittal include the backing material, adhesive, lighting access and any framing or supporting details. Ensure the materials specified are suitable for the salt products and site.
If the project is close to a shower, pool, steam or other source of water, include where the product will go and any installation guidance from the supplier. Ensure you have a qualified professional for electrical and structural work.
5. Delivery & Handling
Before approving, include the quantity being ordered, how many cartons/pallets, total weight of packed items, delivery address and desired delivery time. Include how you would like the delivery checked upon arrival and how any obvious damage or missing items should be reported.
If it is a large project, include how you can request replacement items and if the supplier can identify what product or order batch it is.
6. Approved documentation
Ensure you have everything approved. This should include product details, sample decision, quantity for the project, agreed specifications and delivery notes. Include the project name, date and version number so you know what version has been looked at.
Having a clear submittal will make the designer, purchaser, contractor and installer have everything they need to know before ordering. This can make decisions around the look, quantity, support and delivery easier.