How to Standardize Salt Wall Materials Across Multi-Location Spa Projects
November 19, 2026
Considerations
Due to variations between locations (room conditions of walls, size of walls, lighting schemes, delivery dates and installers), it can be complex to select salt wall material for multiple locations.
Having a consistent specification enables comparison between quotations, approvals and consideration of maintenance. It allows a uniform approach for the project, whilst acknowledging natural variation of salt.
Uniform Material Specification
Within your quotation request, please include the following information in a uniform specification, to be confirmed at all locations:
- Type/Size of salt tiles/bricks
- Wall area (approx.) & design
- Surface & fixing method
- Backlit? If so, any requirements.
- Room type & conditions
- Delivery location & required deadline(s) for project.
- Spare quantities required.
By having a uniform specification, you can ensure suppliers and installers are working from the same information. Specific information for individual locations can be included in addition to this.
Variation in Appearance
As natural salt can vary in colour and appearance, please consider requesting multiple samples, or a sample panel, to be approved for a uniform appearance across multiple locations.
Please note the type of material, sample/batch reference, lighting conditions, and approver within the project team. This can be a useful reference when checking material delivered in future.
Consistent specification & site specific considerations
Although there may be a consistent specification, the conditions of the salt wall may differ between locations. For example, if one wall is located in a dry area, such as a reception, and another is near a sauna or humid area, they may need to be considered separately. Salt is water-soluble; see PubChem’s sodium chloride information and HSW’s salt tile moisture-care guide.
For each location, consider the substrate, support available, humidity levels, lighting and fixing method. Please have the relevant installers visit the location to view it before ordering materials. HSW’s salt wall planning document can help you identify the information to consider.
Lighting
If backlit, consider the lighting solution for the salt wall before installation. Consider where the lighting will go, cabling, electrical components, accessibility for servicing and appearance of sample under lighting scheme.
Ensure electrical works are completed by qualified professionals. Ensure the electrical components selected suit the conditions of the room and installation. Having consistent lighting specifications will allow a uniform design across locations, but can also allow for adjustments between locations. See the NFPA’s home electrical safety guidance.
Compare full quotations
It is easier to compare quotations when all bidders have been asked to provide for the same scope of work. Consider requesting information on how many units of material, packaging, adhesives/fittings, specification of product, and any exclusions.
Also consider how stock is managed, lead times, damaged goods, and replacement parts. When completing multiple locations of salt walls, this information can impact delivery timelines and future maintenance. HSW’s salt wall cost guide covers other project-planning costs.
Pilot
Piloting the installation can help the project team get an understanding of the material, and process. Confirm the appearance, installation process, lighting effect, documentation requirements and handover requirements have all been met.
Once piloted, note any changes to be made. Update the uniform specification before ordering for remaining locations to avoid having to make the same decision for each location.
Future Maintenance Notes
Create a brief summary of information for each location. Include material specification, approved sample reference, supplier information, installation details, care instructions and any remaining spares.
This will help the facilities team in making replacements or extending the salt wall in future renovations.
Quick Check
To confirm a multi-location order is ready to be approved, consider the following:
- Uniform material descriptions and approved appearances across locations?
- Support and conditions of each location considered?
- Appearance under correct lighting approved?
- Quotations provided for similar products with similar delivery requirements?
- Spares and maintenance information allocated per location?
Having a process in place makes it easier to manage design, purchasing, installation and maintenance of multiple locations. For current product options and planning information, please refer to Himalayan Salt Way.
FAQs
Why should we have a consistent specification of salt walls across locations?
It makes comparing quotations, documenting design decisions, managing deliveries, and keeping a consistent approach across locations easier.
Should identical salt pieces be used in all locations?
Not necessarily. Although it is good to have a consistent specification, each location should be considered to have different sizing, substrates, room conditions and installation methods.
Should I just use 1 sample for a large project?
It may not be representative of the variation of salt in a larger installation. Consider requesting multiple samples or a sample panel. This can be viewed under the planned lighting.
When should a backlit scheme be planned?
Lighting should be planned before installation, and considered with the substrate, cabling, electrical access and sample.
What information should be recorded?
Material specification, sample reference, supplier, installation information, care instructions and spare material information for each location.
